leaf

Reports & Presentations

Tools and Guidelines

Structural Geology Guidelines Manual for use in burst-prone underground mines

This manual is intended to provide guidelines for improving current levels of structural geologic data collection and evaluation in rockburst-prone areas in underground mines. It should help geologists and engineers in these mines (or planned mines) to better work together to understand and interpret rock mass conditions associated with faulting and fault slip type seismicity and the impact they can have on underground mine design and planning.

PreCalculatOre v1.5.0

PreCalculatOre is a combined process and cost modelling tool to assess the potential economic benefits of applying surface-based ore pre-concentration techniques at a mine or deposit.

Fugitive Dust Best Practices Manual Guidance Documents

The contents of these documents are based on current Ontario regulations and guidance materials published at the time these documents were prepared.

CEMI Papers

G. Lyle, K. Bullock, A. Dasys, S. Hardcastle, MEMO conference 2010. Evaluation of Ventilation On Demand (VOD) in Sudbury Mines

Antonio C. B. de Araujo, and Helen Shang, 2009. Enhancing a Smelter Off-Gas System Using a Plant-Wide Control Design, Industrial & Engineering Chemistry Research, ACS Publications

Antonio C.B. de Araujo , Romildo P. Brito , Helen Shang , 2009. Mitigation of energy intensity of an industrial off-gas cleaning system using process engineering solutions, Journal of Cleaner Production 17 1512–1525

Duff, D.J., Buksa, H. and Kaiser, P.K., 2008. Strategic Research Program to Develop Tactical Means for Risk Mitigation in Mining, Strategic and Tactical Approaches in Mining 2008

CEMI Documents

Environmental Documents: Climate Change, Zero Water Discharge, and Energy - June 2009

CEMI Annual Report 2010

2010 Innovator Showcase

CEMI Annual Report 2009

CEMI Annual Report 2008

CEMI Project Summary Booklet 2008

CEMI Fact sheets

Others

OMICC Brochure 2007

Staying Ahead of the Pack

OMICC's Integrated Business Plan for CEMI – May 2005